Download full text
(external source)
Citation Suggestion
Please use the following Persistent Identifier (PID) to cite this document:
https://doi.org/10.22394/2410-132X-2024-10-3-82-97
Exports for your reference manager
Повышение результативности НИР: планирование как инструмент снижения технологического риска при разработке двигателей
Increasing R&D effectiveness: planning as a tool for reducing technological risk in engine development
[journal article]
Abstract This article presents the basics and results of applying the Lean R&D methodology in planning as a crucial tool for enhancing the success of innovative projects. By following a step-by-step process, the effectiveness of project execution is improved through a comprehensive list of key tests that inc... view more
This article presents the basics and results of applying the Lean R&D methodology in planning as a crucial tool for enhancing the success of innovative projects. By following a step-by-step process, the effectiveness of project execution is improved through a comprehensive list of key tests that increase in complexity. This approach simplifies early identification of potential issues and reduces the risk of errors during the design phase. A new lean planning method is introduced, including assessing the readiness of the designed product at the design stage based on a roadmap. It also involves analyzing the critical elements (CE) of the product and determining their current level of readiness. Additionally, a functional analysis of the CE is conducted, followed by separate planning for the development of each element. Finally, the project is checked against a set of criteria to achieve technology readiness levels (TRL+). The process of lean planning is demonstrated in the field of engine building through the case of integrated starter-generator (SG) development. Specific elements of the planning structure are considered, and a functional analysis of the SG's CE is conducted for both internal and external primary and secondary impacts. Their interactions and control events are determined according to detailed TRL+ criteria, allowing for the reduction of technological risks, shorter project execution times, and increased efficiency in innovative technology development through the use of this planning tool.... view less
Classification
Economic Sectors
Free Keywords
R&D planning; gas turbine engine; risk mitigation; critical elements; TRL; starter-generator; milestones; functional analysis
Document language
Russian
Publication Year
2024
Page/Pages
p. 82-97
Journal
Ekonomika Nauki / Economics of Science, 10 (2024) 3
ISSN
2410-132X
Status
Published Version; reviewed
Licence
Creative Commons - Attribution-Noncommercial-No Derivative Works 4.0